![]() Then OFF the Purging by rotating the purge valve in clockwise direction. ![]() Green colour and Ready indication will be appearing on screen after the Initialization process.Ĭlick on set up- pump, feed the flow rate NMT 4, of solvent and then start the purging by rotating the purge wall in anticlockwise direction approx 10 minute. Initialization process of HPLC system will be start which shows by yellow colour. In this manual we describe the efficient use of the data acquisition, analysis. Start the Open Lab Chemistration by double-clicking the Short cute Open Lab Chemistration located on your desktop. Switch on the detector, column compartment, Pump and vacuum degasser simultaneously).Įnsure that the outlet from the detector dips into a waste bottle. PROCEDURE (OPERATION) 4.1 Ensure that the HPLC system is placed in a clean and dust free area.Įnsure that instrument have been connected to the main power unit. Film Goodbye Mr Cool Sub Indonesia Manual Film Goodbye.
0 Comments
Leave a Reply. |